Home Category Region Publishers About Us Contact Us
Home > Market Research Report > Energy > Vendor Assessment: Industry Short List for Scheduling, Nominations, and Settlement -- Closing the Loop on Energy Deals
Category
Energy (4160)
Battery (205)
Clean Energy (793)
Electricity Market (413)
Fossil Fuel (936)
Fuel Cell (79)
Nuclear Energy (85)
Photovoltaics (318)
Power Generation Set (1018)
Smart Grid (230)
UPS (65)
Wind Energy (165)
Market Research Report

Vendor Assessment: Industry Short List for Scheduling, Nominations, and Settlement -- Closing the Loop on Energy Deals

Published by IDC Energy Insights
Published May, 2009 Product code 94811
Content info Pages: 39
Price
Not Available

This publication has been discontinued on June 28, 2011.

Introduction

Abstract

This Energy Insights report looks at eight vendors that provide scheduling, nominations, and settlement functionality — Allegro, Amphora, OpenLink Financial, SolArc, SunGard Energy, The Structure Group, Triple Point, and Ventyx. With economic conditions and reduced liquidity in energy commodity markets, the emphasis in energy trading has shifted from financial to the physical delivery of energy. Today, companies trading energy are emphasizing physical delivery of energy as they seek to reduce costs and mitigate risk.

According to Jill Feblowitz, practice director of Business Technology, "Over the past two years, vendors have been building richer functionality in scheduling, nominations, logistics and settlement. There are some vendors that have built in capabilities for more operational intelligence such as the ability to optimize the delivery path, such as for gas as it moves through storage and pipelines, for economic benefit. This type of analysis will be critical to energy companies going forward."

Table of Contents

  • Energy Insights Opinion
  • In This Report
    • Methodology
    • Market Definition
      • Market Size and Average Deals
      • Vendors Reviewed
  • Situation Overview
    • Weights Applied to Criteria
      • Fit to Market
        • Feature/Function — High Priority in New Market — 2
        • Scalability: Users — 0
        • Scalability: Throughput — 1
        • Scalability: Capacity/Storage — 2
        • Scalability: Response Time — 1
        • Integration and Application Architecture — 2
        • Platform Support — 0
        • Range of Services — 1
        • Pricing Arrangements — 1
        • Hardware Cost — 0
        • Implementation Support and Tools — 1
      • Ownership Confidence
        • Supplier' s Market Share — 1
        • Supplier' s Profitability — 1
        • Supplier' s Research and Development Investment Level — 1
        • Customer Satisfaction with Implementation — 2
        • Customer Satisfaction with Ongoing Support — 2
      • How Vendors Are Rated
    • Evaluating the Vendors
      • Industry Short List Evaluations
      • The Ratings
      • Vendor Profiles
        • Allegro
        • Amphora
        • OpenLink Financial
        • SolArc
        • SunGard
        • The Structure Group
        • Triple Point
        • Ventyx
  • Future Outlook
    • Outlook for Vendors
      • Allegro
      • Amphora
      • OpenLink Financial
      • SolArc
      • SunGard
      • The Structure Group
      • Triple Point
      • Ventyx
  • Essential Guidance
    • Actions to Consider
  • Learn More
    • Related Research
    • Methodology
      • Insights Industry Short List Tool Criteria
      • A Note on Weights Applied to Criteria
    • Appendix
      • Fit to Market Needs (X-Axis)
        • Feature/Function
        • Scalability
        • Capacity/Storage
        • Integration Capability
        • Range of Services
        • Hardware Costs
      • Ownership Confidence (Y-Axis)
    • Synopsis
  • Table: General Functionality
  • Table: Pipeline Functionality
  • Table: Power Scheduling
  • Table: Other Means of Transport
  • Table: Scheduling, Nominations, and Settlement Market: Industry Short List Vendor Overview
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Vendor Ratings for Fit to Market (X-Axis) Attributes
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Vendor Ratings for Ownership Confidence (Y-Axis) Attributes
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Feature/Functionality
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Scalability — Users
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Scalability — Throughput
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Capacity/Storage
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Capacity/Storage — Response Time
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Capacity/Storage — Platform and Architecture Support
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Integration Capability
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Range of Services
  • Table: Industry Short list for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Range of Services — Pricing Arrangements
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Range of Services — Implementation Support and Tools
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Hardware Costs
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Market Share
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Profitability
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Supplier' s R&D Level
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Customer Satisfaction with Implementation
  • Table: Industry Short List for Scheduling, Nominations, and Settlement Market: Definition of Ratings for Customer Satisfaction with Ongoing Support
  • Figure: Power Market Scheduling in North America
  • Figure: Industry Short List: Scheduling, Nominations, and Settlement — Comparative Analysis
Back to Top