Cover Image
Market Research Report

Europe Data Center Construction Market-Companies Profiles, Size, Share, Growth, Trends and Forecast to 2026

Published by Data Bridge Market Research Private Limited Product code 823454
Published Content info 100 Pages
Delivery time: 1-2 business days
Price
Back to Top
Europe Data Center Construction Market-Companies Profiles, Size, Share, Growth, Trends and Forecast to 2026
Published: March 18, 2019 Content info: 100 Pages
Description

Europe data center construction market is expected to reach a CAGR of 10.9% in the forecast period of 2019 to 2026. The new market report contains data for the historic year 2017, the base year of calculation is 2018 and the forecast period is 2019 to 2026.

Market Segmentation

By Infrastructure Type (electrical Infrastructure, mechanical infrastructure, general infrastructure), Data Center Type (Tier 1, Tier 2, Tier 3, Tier 4), Organization Size (small size organization, medium size organization, large size organization ), Vertical (Banking, financial services,and insurance, IT & Telecommunications, Government & Defense, Healthcare, Retail Colocation, Power & Energy, Manufacturing, Others), Country (U.K., Germany, France, Netherlands, Switzerland, Spain, Italy, Sweden, Russia, Turkey and Rest of Europe)

Major growing sectors under the market segmentation are as follows:

In infrastructure type, mechanical infrastructure segment is likely to grow at the highest CAGR because mechanical infrastructure has potential to reduce the overall project cost, makes the use of space with high efficiency, and provides high safety features.

In data center type, tier IV segment is likely to grow at the highest CAGR because Tier 4 has many advantages over tier 1, tier 2 and tier 3 data centers such as high availability at over 99.99%, planned & unplanned outages do not cause any disruption to equipment, all equipment is dual-powered, fault-resistant and others.

In organization size, small organization segment is likely to grow at the highest CAGR because the government funding to the small size organization has enforce the small size organization to expand their business in the future. Due to which the amount of data generated by these organization need to manage such that the data must be secure from theft. This factor tends to increase the need of data construction in the coming future.

In vertical, retail colocation segment is likely to grow at the highest CAGR in the forecast period of 2019 to 2026 because rapidly increasing Ecommerce.

Key Market Players

The key market players for Europe data center construction market are listed below:

  • CORGAN
  • Currie & Brown Holdings Limited
  • DPR Construction
  • Holder Construction Company
  • AECOM
  • Arup
  • HDR
  • Jones Engineering Group
  • Turner Construction Company
  • FORTIS CONSTRUCTION, INC,
  • ISG plc
  • Skanska
  • Gensler
  • Schneider Electric
  • Structure Tone
  • M. A. Mortenson Company
  • ROGERS-O'BRIEN CONSTRUCTION COMPANY LTD
  • Brasfield & Gorrie
  • Pepper Construction
  • The Boldt Company
Table of Contents

TABLE OF CONTENTS

1 INTRODUCTION

  • 1.1 OBJECTIVES OF THE STUDY
  • 1.2 MARKET DEFINITION
  • 1.3 OVERVIEW OF EUROPE DATA CENTER CONSTRUCTION MARKET
  • 1.4 CURRENCY AND PRICING
  • 1.5 LIMITATIONS
  • 1.6 MARKETS COVERED

2 MARKET SEGMENTATION

  • 2.1 MARKETS COVERED
  • 2.2 GEOGRAPHICAL SCOPE
  • 2.3 YEAR CONSIDERED FOR THE STUDY
  • 2.4 CURRENCY AND PRICING
  • 2.5 DBMR TRIPOD DATA VALIDATION MODEL
  • 2.6 DBMR MARKET SWOT MODEL
  • 2.7 PRIMARY INTERVIEWS WITH KEY OPINION LEADERS
  • 2.8 DBMR MARKET POSITION GRID
  • 2.9 THE CATEGORY VS TIME GRID
  • 2.10 DBMR MARKET CHALLENGE MATRIX
  • 2.11 SECONDARY SOURCES
  • 2.12 ASSUMPTIONS

3 MARKET OVERVIEW

  • 3.1 DRIVERS
    • 3.1.1 RISING CONSTRUCTION OF HYPERSCALE DATA CENTER FACILITIES
    • 3.1.2 INCREASING DEMAND FOR DATA CENTER COLOCATION
    • 3.1.3 GROWING DEMAND OF DATA CENTERS FROM BANKING AND FINANCE SECTOR
    • 3.1.4 RISING DATA TRAFFIC DUE TO IOT AND CLOUD-BASED SERVICES
  • 3.2 RESTRAINT
    • 3.2.1 HIGH INITIAL INVESTMENT COST FOR DATA CENTER CONSTRUCTION
  • 3.3 OPPORTUNITIES
    • 3.3.1 RAPIDLY INCREASING DIGITALIZATION ACROSS THE VERTICALS
    • 3.3.2 INCREASING GENERATION OF UNSTRUCTURED DATA
  • 3.4 CHALLENGES
    • 3.4.1 LACK OF SKILLED PERSONNEL
    • 3.4.2 LOCATION OF DATA CENTER CONSTRUCTION

4 EXECUTIVE SUMMARY

5 PREMIUM INSIGHTS

  • 5.1 MULTIVARIATE MODELLING
  • 5.2 MARKET TIMELINE
  • 5.3 VENDOR SHARE ANALYSIS

6 INDUSTRY INSIGHTS

7 EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE

  • 7.1 OVERVIEW
  • 7.2 ELECTRICAL INFRASTRUCTURE
    • 7.2.1 UPS
    • 7.2.2 GENERATORS
    • 7.2.3 RACK POWER DISTRIBUTION UNIT
    • 7.2.4 TRANSFER SWITCHES & SWITCHGEAR
    • 7.2.5 OTHERS (WIRES)
  • 7.3 MECHANICAL INFRASTRUCTURE
    • 7.3.1 COOLING SYSTEM
      • 7.3.1.1 CRAC AND CRAH UNIT
      • 7.3.1.2 CHILLER
      • 7.3.1.3 COOLING TOWERS AND DRY COOLERS
      • 7.3.1.4 ECONOMIZER AND EVAPORATIVES COOLERS
      • 7.3.1.5 OTHERS
    • 7.3.2 RACKS
  • 7.4 GENERAL CONSTRUCTION
    • 7.4.1 BUILDING DEVELOPMENT
    • 7.4.2 PHYSICAL SECURITY
    • 7.4.3 DATA CENTER INFRASTRUCTURE MANAGEMENT
    • 7.4.4 BUILDING DESIGN
    • 7.4.5 INSTALLATION AND COMMISSIONING SERVICES

8 EUROPE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE

  • 8.1 OVERVIEW
  • 8.2 TIER 1
  • 8.3 TIER 2
  • 8.4 TIER 3
  • 8.5 TIER 4

9 EUROPE DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE

  • 9.1 OVERVIEW
  • 9.2 SMALL SIZE ORGANIZATION
  • 9.3 MEDIUM SIZE ORGANIZATION
  • 9.4 LARGE SIZE ORGANIZATION

10 EUROPE DATA CENTER CONSTRUCTION MARKET, BY VERTICAL

  • 10.1 OVERVIEW
  • 10.2 BANKING, FINANCIAL SERVICES, AND INSURANCE
  • 10.3 IT & TELECOMMUNICATIONS
  • 10.4 GOVERNMENT & DEFENSE
  • 10.5 HEALTHCARE
  • 10.6 RETAIL COLOCATION
  • 10.7 POWER & ENERGY
  • 10.8 MANUFACTURING
  • 10.9 OTHERS (MEDIA AND ENTERTAINMENT)

11 EUROPE DATA CENTER CONTRUCTION MARKET, BY GEOGRAPHY

  • 11.1 EUROPE
    • 11.1.1 U.K.
    • 11.1.2 GERMANY
    • 11.1.3 FRANCE
    • 11.1.4 NETHERLANDS
    • 11.1.5 SWITZERLAND
    • 11.1.6 SPAIN
    • 11.1.7 ITALY
    • 11.1.8 SWEDEN
    • 11.1.9 RUSSIA
    • 11.1.10 TURKEY
    • 11.1.11 REST OF EUROPE

12 EUROPE DATA CENTER CONSTRUCTION MARKET, COMPANY LANDSCAPE

  • 12.1 COMPANY SHARE ANALYSIS: EUROPE

13 COMPANY PROFILE

  • 13.1 TURNER CONSTRUCTION COMPANY
    • 13.1.1 COMPANY SNAPSHOT
    • 13.1.2 COMPANY SHARE ANALYSIS
    • 13.1.3 SWOT ANALYSIS
    • 13.1.4 GEOGRAPHICAL PRESENCE
    • 13.1.5 SERVICE PORTFOLIO
    • 13.1.6 RECENT PROJECTS
    • 13.1.7 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.2 DPR CONSTRUCTION
    • 13.2.1 COMPANY SNAPSHOT
    • 13.2.2 COMPANY SHARE ANALYSIS
    • 13.2.3 SWOT ANALYSIS
    • 13.2.4 GEOGRAPHICAL PRESENCE
    • 13.2.5 SERVICE PORTFOLIO
    • 13.2.6 RECENT PROJECTS
    • 13.2.7 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.3 AECOM
    • 13.3.1 COMPANY SNAPSHOT
    • 13.3.2 COMPANY SHARE ANALYSIS
    • 13.3.3 SWOT ANALYSIS
    • 13.3.4 GEOGRAPHICAL PRESENCE
    • 13.3.5 REVENUE ANALYSIS
    • 13.3.6 SERVICE PORTFOLIO
    • 13.3.7 RECENT PROJECTS
    • 13.3.8 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.4 SCHNEIDER ELECTRIC
    • 13.4.1 COMPANY SNAPSHOT
    • 13.4.2 COMPANY SHARE ANALYSIS
    • 13.4.3 SWOT ANALYSIS
    • 13.4.4 GEOGRAPHICAL PRESENCE
    • 13.4.5 REVENUE ANALYSIS
    • 13.4.6 SERVICE PORTFOLIO
    • 13.4.7 RECENT DEVELOPMENTS
    • 13.4.8 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.5 M. A. MORTENSON COMPANY
    • 13.5.1 COMPANY SNAPSHOT
    • 13.5.2 COMPANY SHARE ANALYSIS
    • 13.5.3 SWOT ANALYSIS
    • 13.5.4 GEOGRAPHICAL PRESENCE
    • 13.5.5 SERVICE PORTFOLIO
    • 13.5.6 RECENT PROJECTS
    • 13.5.7 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.6 ARUP
    • 13.6.1 COMPANY SNAPSHOT
    • 13.6.2 GEOGRAPHICAL PRESENCE
    • 13.6.3 REVENUE ANALYSIS
    • 13.6.4 SERVICE PORTFOLIO
    • 13.6.5 RECENT PROJECTS
  • 13.7 BRASFIELD & GORRIE
    • 13.7.1 COMPANY SNAPSHOT
    • 13.7.2 SERVICE PORTFOLIO
    • 13.7.3 RECENT PROJECTS
  • 13.8 CORGAN
    • 13.8.1 COMPANY SNAPSHOT
    • 13.8.2 GEOGRAPHICAL PRESENCE
    • 13.8.3 SERVICE PORTFOLIO
    • 13.8.4 RECENT PROJECTS
  • 13.9 CURRIE & BROWN HOLDINGS LIMITED
    • 13.9.1 COMPANY SNAPSHOT
    • 13.9.2 GEOGRAPHICAL PRESENCE
    • 13.9.3 SERVICE PORTFOLIO
    • 13.9.4 RECENT PROJECT
  • 13.10 FORTIS CONSTRUCTION, INC
    • 13.10.1 COMPANY SNAPSHOT
    • 13.10.2 GEOGRAPHICAL PRESENCE
    • 13.10.3 SERVICE PORTFOLIO
    • 13.10.4 RECENT PROJECTS
  • 13.11 GENSLER
    • 13.11.1 COMPANY SNAPSHOT
    • 13.11.2 GEOGRAPHICAL PRESENCE
    • 13.11.3 REVENUE ANALYSIS
    • 13.11.4 SERVICE PORTFOLIO
    • 13.11.5 RECENT PROJECTS
  • 13.12 HDR
    • 13.12.1 COMPANY SNAPSHOT
    • 13.12.2 GEOGRAPHICAL PRESENCE
    • 13.12.3 SERVICE PORTFOLIO
    • 13.12.4 RECENT PROJECT
  • 13.13 HOLDER CONSTRUCTION COMPANY
    • 13.13.1 COMPANY SNAPSHOT
    • 13.13.2 GEOGRAPHICAL PRESENCE
    • 13.13.3 SERVICE PORTFOLIO
    • 13.13.4 RECENT PROJECT
  • 13.14 ISG PLC
    • 13.14.1 COMPANY SNAPSHOT
    • 13.14.2 GEOGRAPHICAL PRESENCE
    • 13.14.3 REVENUE ANALYSIS
    • 13.14.4 SERVICE PORTFOLIO
    • 13.14.5 RECENT PROJECTS
  • 13.15 JACOBS ENGINEERING GROUP
    • 13.15.1 COMPANY SNAPSHOT
    • 13.15.2 GEOGRAPHICAL PRESENCE
    • 13.15.3 REVENUE ANALYSIS
    • 13.15.4 SERVICE PORTFOLIO
    • 13.15.5 RECENT PROJECT
  • 13.16 JONES ENGINEERING GROUP
    • 13.16.1 COMPANY SNAPSHOT
    • 13.16.2 GEOGRAPHICAL PRESENCE
    • 13.16.3 SERVICE PORTFOLIO
    • 13.16.4 RECENT PROJECT
  • 13.17 PEPPER CONSTRUCTION
    • 13.17.1 COMPANY SNAPSHOT
    • 13.17.2 SERVICE PORTFOLIO
    • 13.17.3 RECENT PROJECT
  • 13.18 ROGERS-O'BRIEN CONSTRUCTION COMPANY, LTD
    • 13.18.1 COMPANY SNAPSHOT
    • 13.18.2 SERVICE PORTFOLIO
    • 13.18.3 RECENT PROJECT
  • 13.19 SKANSKA
    • 13.19.1 COMPANY SNAPSHOT
    • 13.19.2 GEOGRAPHICAL PRESENCE
    • 13.19.3 REVENUE ANALYSIS
    • 13.19.4 SERVICE PORTFOLIO
    • 13.19.5 RECENT PROJECTS
  • 13.20 STRUCTURE TONE
    • 13.20.1 COMPANY SNAPSHOT
    • 13.20.2 GEOGRAPHICAL PRESENCE
    • 13.20.3 SERVICE PORTFOLIO
    • 13.20.4 RECENT PROJECTS
  • 13.21 THE BOLDT COMPANY
    • 13.21.1 COMPANY SNAPSHOT
    • 13.21.2 SERVICE PORTFOLIO
    • 13.21.3 RECENT PROJECT

14 CONCLUSION

15 QUESTIONNAIRE

16 RELATED REPORTS

LIST OF TABLES

  • TABLE 1 EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 2 EUROPE ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 3 EUROPE UPS IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 4 EUROPE GENERATORS IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 5 EUROPE RACK POWER DISTRIBUTION UNIT IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 6 EUROPE TRANSFER SWITCHES & SWITCHGEAR IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 7 EUROPE OTHERS IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 8 EUROPE MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 9 EUROPE COOLING SYSTEM IN MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 10 EUROPE RACKS IN MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 11 EUROPE GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 12 EUROPE BUILDLING DEVELOPMENT IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 13 EUROPE PHYSICAL SECURITY IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 14 EUROPE DATA CENTER INFRASTRCUTURE MANAGEMENT IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 15 EUROPE BUILDLING DESIGN IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 16 EUROPE INSTALLATION AND COMMISSIONING SERVICES IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 17 EUROPE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017- 2026 (USD MILLION)
  • TABLE 18 EUROPE TIER 1 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 19 EUROPE TIER 2 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 20 EUROPE TIER 3 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 21 EUROPE TIER 4 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 22 EUROPE DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017- 2026 (USD MILLION)
  • TABLE 23 EUROPE SMALL SIZE ORGANIZATION DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 24 EUROPE MEDIUM SIZE ORGANIZATION DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 25 EUROPE LARGE SIZE ORGANIZATION DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 26 EUROPE DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017- 2026 (USD MILLION)
  • TABLE 27 EUROPE BANKING FINANCE SERVICES AND INSURANCE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 28 EUROPE IT & TELECOMMUNICATIONS IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 29 EUROPE GOVERNMENT & DEFENSE DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 30 EUROPE HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 31 EUROPE RETAIL COLOCATION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 32 EUROPE POWER & ENERGY IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 33 EUROPE MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 34 EUROPE OTHERS DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 35 EUROPE DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2017-2026 (USD MILLION)
  • TABLE 36 EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 37 EUROPE ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 38 EUROPE MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 39 EUROPE COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 40 EUROPE GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 41 EUROPE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 42 EUROPE DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 43 EUROPE DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 44 U.K. DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 45 U.K. ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 46 U.K. MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 47 U.K. COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 48 U.K. GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 49 U.K. DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 50 U.K. DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 51 U.K. DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 52 GERMANY DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 53 GERMANY ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 54 GERMANY MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 55 GERMANY COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 56 GERMANY GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 57 GERMANY DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 58 GERMANY DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 59 GERMANY DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 60 FRANCE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 61 FRANCE ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 62 FRANCE MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 63 FRANCE COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 64 FRANCE GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 65 FRANCE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 66 FRANCE DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 67 FRANCE DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 68 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 69 NETHERLANDS ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 70 NETHERLANDS MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 71 NETHERLANDS COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 72 NETHERLANDS GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 73 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 74 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 75 NETHERLANDS DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 76 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 77 SWITZERLAND ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 78 SWITZERLAND MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 79 SWITZERLAND COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 80 SWITZERLAND GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 81 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 82 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 83 SWITZERLAND DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 84 SPAIN DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 85 SPAIN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 86 SPAIN MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 87 SPAIN COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 88 SPAIN GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 89 SPAIN DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 90 SPAIN DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 91 SPAIN DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 92 ITALY DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 93 ITALY ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 94 ITALY MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 95 ITALY COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 96 ITALY GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 97 ITALY DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 98 ITALY DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 99 ITALY DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 100 SWEDEN DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 101 SWEDEN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 102 SWEDEN MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 103 SWEDEN COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 104 SWEDEN GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 105 SWEDEN DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 106 SWEDEN DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 107 SWEDEN DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 108 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 109 RUSSIA ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 110 RUSSIA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 111 RUSSIA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 112 RUSSIA GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 113 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 114 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 115 RUSSIA DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 116 TURKEY DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 117 TURKEY ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 118 TURKEY MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 119 TURKEY COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 120 TURKEY GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 121 TURKEY DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 122 TURKEY DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 123 TURKEY DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 124 REST OF EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)

LIST OF FIGURES

  • FIGURE 1 EUROPE DATA CENTER CONSTRUCTION MARKET: SEGMENTATION
  • FIGURE 2 EUROPE DATA CENTER CONSTRUCTION MARKET: DATA TRIANGULATION
  • FIGURE 3 EUROPE DATA CENTER CONSTRUCTION MARKET: DROC ANALYSIS
  • FIGURE 4 EUROPE DATA CENTER CONSTRUCTION MARKET: EUROPE VS REGIONAL MARKET ANALYSIS
  • FIGURE 5 EUROPE DATA CENTER CONSTRUCTION MARKET: COMPANY RESEARCH ANALYSIS
  • FIGURE 6 EUROPE DATA CENTER CONSTRUCTION MARKET: INTERVIEW DEMOGRAPHICS
  • FIGURE 7 EUROPE DATA CENTER CONSTRUCTION MARKET: DBMR MARKET POSITION GRID
  • FIGURE 8 EUROPE DATA CENTER CONSTRUCTION MARKET: THE CATEGORY VS TIME GRID
  • FIGURE 9 EUROPE DATA CENTER CONSTRUCTION MARKET: THE MARKET CHALLENGE MATRIX
  • FIGURE 10 DRIVERS, RESTRAINTS, OPPORTUNITIES, AND CHALLENGES OF EUROPE DATA CENTER CONSTRUCTION MARKET
  • FIGURE 11 EUROPE DATA CENTER CONSTRUCTION MARKET: SEGMENTATION
  • FIGURE 12 RISING CONSTRUCTION OF HYPERSCALE DATA CENTERS IS ONE OF THE MAJOR FACTOR DRIVE THE GROWTH OF THE EUROPE DATA CENTER CONSTRUCTION MARKET IN THE FORECAST PERIOD OF 2019 TO 2026
  • FIGURE 13 ELECTRICAL INFRASTRUCTURE TYPE IS EXPECTED TO ACCOUNT FOR THE LARGEST SHARE OF THE EUROPE DATA CENTER CONSTRUCTION MARKET IN 2019 & 2026
  • FIGURE 14 EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018
  • FIGURE 15 EUROPE DATA CENTER CONSTRUCTION MARKET, DATA CENTER TYPE, 2018
  • FIGURE 16 EUROPE DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018
  • FIGURE 17 EUROPE DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2018
  • FIGURE 18 EUROPE DATA CENTER CONSTRUCTION MARKET: SNAPSHOT (2018)
  • FIGURE 19 EUROPE DATA CENTER CONSTRUCTION MARKET: BY COUNTRY (2018)
  • FIGURE 20 EUROPE DATA CENTER CONSTRUCTION MARKET: BY COUNTRY (2019 & 2026)
  • FIGURE 21 EUROPE DATA CENTER CONSTRUCTION MARKET, BY COUNTRY (2018 & 2026)
  • FIGURE 22 EUROPE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE (2019 -2026)
  • FIGURE 23 EUROPE DATA CENTER CONSTRUCTION MARKET: COMPANY SHARE 2018 (%)
Back to Top