Asia-Pacific Data Center Construction Market-Companies Profiles, Size, Share, Growth, Trends and Forecast to 2026
Published: March 18, 2019 Content info: 100 Pages
Description

Asia-Pacific data center construction market is expected to reach a CAGR of 12.4% in the forecast period of 2019 to 2026. The new market report contains data for the historic year 2017, the base year of calculation is 2018 and the forecast period is 2019 to 2026.

Market Segmentation

By Infrastructure Type (electrical Infrastructure, mechanical infrastructure, general infrastructure), Data Center Type (Tier 1, Tier 2, Tier 3, Tier 4), Organization Size (small size organization, medium size organization, large size organization ), Vertical (Banking, financial services and insurance, IT & Telecommunications, Government & Defense, Healthcare, Retail Colocation, Power & Energy, Manufacturing, Others), Country (Japan, China, Australia, India, Singapore, Hong Kong, Indonesia, Thailand, Philippines, South Korea and Rest of Asia-Pacific)

Major growing sectors under the market segmentation are as follows:

In infrastructure type, mechanical infrastructure segment is likely to grow at the highest CAGR because mechanical infrastructure has potential to reduce the overall project cost, makes the use of space with high efficiency, and provides high safety features.

In data center type, tier IV segment is likely to grow at the highest CAGR because Tier 4 has many advantages over tier 1, tier 2 and tier 3 data centers such as high availability at over 99.99%, planned & unplanned outages do not cause any disruption to equipment, all equipment is dual-powered, fault-resistant and others.

In organization size, small organization segment is likely to grow at the highest CAGR because the government funding to the small size organization has enforce the small size organization to expand their business in the future. Due to which the amount of data generated by these organization need to manage such that the data must be secure from theft. This factor tends to increase the need of data construction in the coming future.

In vertical, retail colocation segment is likely to grow at the highest CAGR in the forecast period of 2019 to 2026 because rapidly increasing Ecommerce websites.

Key Market Players

The key market players for Asia-Pacific data center construction market are listed below:

  • CORGAN
  • Currie & Brown Holdings Limited
  • DPR Construction
  • Holder Construction Company
  • AECOM
  • Arup
  • HDR
  • Jones Engineering Group
  • Turner Construction Company
  • FORTIS CONSTRUCTION, INC,
  • ISG plc
  • Skanska
  • Gensler
  • Schneider Electric
  • Structure Tone
  • M. A. Mortenson Company
  • ROGERS-O'BRIEN CONSTRUCTION COMPANY LTD
  • Brasfield & Gorrie
  • Pepper Construction
  • The Boldt Company
Table of Contents

TABLE OF CONTENTS

1 INTRODUCTION

  • 1.1 OBJECTIVES OF THE STUDY
  • 1.2 MARKET DEFINITION
  • 1.3 OVERVIEW OF ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET
  • 1.4 CURRENCY AND PRICING
  • 1.5 LIMITATIONS
  • 1.6 MARKETS COVERED

2 MARKET SEGMENTATION

  • 2.1 MARKETS COVERED
  • 2.2 GEOGRAPHICAL SCOPE
  • 2.3 YEAR CONSIDERED FOR THE STUDY
  • 2.4 CURRENCY AND PRICING
  • 2.5 DBMR TRIPOD DATA VALIDATION MODEL
  • 2.6 DBMR MARKET SWOT MODEL
  • 2.7 PRIMARY INTERVIEWS WITH KEY OPINION LEADERS
  • 2.8 DBMR MARKET POSITION GRID
  • 2.9 THE CATEGORY VS TIME GRID
  • 2.10 DBMR MARKET CHALLENGE MATRIX
  • 2.11 SECONDARY SOURCES
  • 2.12 ASSUMPTIONS

3 MARKET OVERVIEW

  • 3.1 DRIVERS
    • 3.1.1 RISING CONSTRUCTION OF HYPERSCALE DATA CENTER FACILITIES
    • 3.1.2 INCREASING DEMAND FOR DATA CENTER COLOCATION
    • 3.1.3 GROWING DEMAND OF DATA CENTERS FROM BANKING AND FINANCE SECTOR
    • 3.1.4 RISING DATA TRAFFIC DUE TO IOT AND CLOUD-BASED SERVICES
  • 3.2 RESTRAINT
    • 3.2.1 HIGH INITIAL INVESTMENT COST FOR DATA CENTER CONSTRUCTION
  • 3.3 OPPORTUNITIES
    • 3.3.1 RAPIDLY INCREASING DIGITALIZATION ACROSS THE VERTICALS
    • 3.3.2 INCREASING GENERATION OF UNSTRUCTURED DATA
  • 3.4 CHALLENGES
    • 3.4.1 LACK OF SKILLED PERSONNEL
    • 3.4.2 LOCATION OF DATA CENTER CONSTRUCTION

4 EXECUTIVE SUMMARY

5 PREMIUM INSIGHTS

  • 5.1 MULTIVARIATE MODELLING
  • 5.2 MARKET TIMELINE
  • 5.3 VENDOR SHARE ANALYSIS

6 INDUSTRY INSIGHTS

7 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE

  • 7.1 OVERVIEW
  • 7.2 ELECTRICAL INFRASTRUCTURE
    • 7.2.1 UPS
    • 7.2.2 GENERATORS
    • 7.2.3 RACK POWER DISTRIBUTION UNIT
    • 7.2.4 TRANSFER SWITCHES & SWITCHGEAR
    • 7.2.5 OTHERS (WIRES)
  • 7.3 MECHANICAL INFRASTRUCTURE
    • 7.3.1 COOLING SYSTEM
      • 7.3.1.1 CRAC AND CRAH UNIT
      • 7.3.1.2 CHILLER
      • 7.3.1.3 COOLING TOWERS AND DRY COOLERS
      • 7.3.1.4 ECONOMIZER AND EVAPORATIVES COOLERS
      • 7.3.1.5 OTHERS
    • 7.3.2 RACKS
  • 7.4 GENERAL CONSTRUCTION
    • 7.4.1 BUILDING DEVELOPMENT
    • 7.4.2 PHYSICAL SECURITY
    • 7.4.3 DATA CENTER INFRASTRUCTURE MANAGEMENT
    • 7.4.4 BUILDING DESIGN
    • 7.4.5 INSTALLATION AND COMMISSIONING SERVICES

8 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE

  • 8.1 OVERVIEW
  • 8.2 TIER 1
  • 8.3 TIER 2
  • 8.4 TIER 3
  • 8.5 TIER 4

9 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE

  • 9.1 OVERVIEW
  • 9.2 SMALL SIZE ORGANIZATION
  • 9.3 MEDIUM SIZE ORGANIZATION
  • 9.4 LARGE SIZE ORGANIZATION

10 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY VERTICAL

  • 10.1 OVERVIEW
  • 10.2 BANKING, FINANCIAL SERVICES, AND INSURANCE
  • 10.3 IT & TELECOMMUNICATIONS
  • 10.4 GOVERNMENT & DEFENSE
  • 10.5 HEALTHCARE
  • 10.6 RETAIL COLOCATION
  • 10.7 POWER & ENERGY
  • 10.8 MANUFACTURING
  • 10.9 OTHERS (MEDIA AND ENTERTAINMENT)

11 ASIA-PACIFIC DATA CENTER CONTRUCTION MARKET, BY GEOGRAPHY

  • 11.1 ASIA-PACIFIC
    • 11.1.1 JAPAN
    • 11.1.2 CHINA
    • 11.1.3 AUSTRALIA
    • 11.1.4 INDIA
    • 11.1.5 SINGAPORE
    • 11.1.6 HONG KONG
    • 11.1.7 INDONESIA
    • 11.1.8 THAILAND
    • 11.1.9 PHILIPPINES
    • 11.1.10 SOUTH KOREA
    • 11.1.11 REST OF ASIA-PACIFIC

12 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, COMPANY LANDSCAPE

  • 12.1 COMPANY SHARE ANALYSIS: ASIA-PACIFIC

13 COMPANY PROFILE

  • 13.1 TURNER CONSTRUCTION COMPANY
    • 13.1.1 COMPANY SNAPSHOT
    • 13.1.2 COMPANY SHARE ANALYSIS
    • 13.1.3 SWOT ANALYSIS
    • 13.1.4 GEOGRAPHICAL PRESENCE
    • 13.1.5 SERVICE PORTFOLIO
    • 13.1.6 RECENT PROJECTS
    • 13.1.7 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.2 DPR CONSTRUCTION
    • 13.2.1 COMPANY SNAPSHOT
    • 13.2.2 COMPANY SHARE ANALYSIS
    • 13.2.3 SWOT ANALYSIS
    • 13.2.4 GEOGRAPHICAL PRESENCE
    • 13.2.5 SERVICE PORTFOLIO
    • 13.2.6 RECENT PROJECTS
    • 13.2.7 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.3 AECOM
    • 13.3.1 COMPANY SNAPSHOT
    • 13.3.2 COMPANY SHARE ANALYSIS
    • 13.3.3 SWOT ANALYSIS
    • 13.3.4 GEOGRAPHICAL PRESENCE
    • 13.3.5 REVENUE ANALYSIS
    • 13.3.6 SERVICE PORTFOLIO
    • 13.3.7 RECENT PROJECTS
    • 13.3.8 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.4 SCHNEIDER ELECTRIC
    • 13.4.1 COMPANY SNAPSHOT
    • 13.4.2 COMPANY SHARE ANALYSIS
    • 13.4.3 SWOT ANALYSIS
    • 13.4.4 GEOGRAPHICAL PRESENCE
    • 13.4.5 REVENUE ANALYSIS
    • 13.4.6 SERVICE PORTFOLIO
    • 13.4.7 RECENT DEVELOPMENTS
    • 13.4.8 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.5 M. A. MORTENSON COMPANY
    • 13.5.1 COMPANY SNAPSHOT
    • 13.5.2 COMPANY SHARE ANALYSIS
    • 13.5.3 SWOT ANALYSIS
    • 13.5.4 GEOGRAPHICAL PRESENCE
    • 13.5.5 SERVICE PORTFOLIO
    • 13.5.6 RECENT PROJECTS
    • 13.5.7 DATA BRIDGE MARKET RESEARCH ANALYSIS
  • 13.6 ARUP
    • 13.6.1 COMPANY SNAPSHOT
    • 13.6.2 GEOGRAPHICAL PRESENCE
    • 13.6.3 REVENUE ANALYSIS
    • 13.6.4 SERVICE PORTFOLIO
    • 13.6.5 RECENT PROJECTS
  • 13.7 BRASFIELD & GORRIE
    • 13.7.1 COMPANY SNAPSHOT
    • 13.7.2 SERVICE PORTFOLIO
    • 13.7.3 RECENT PROJECTS
  • 13.8 CORGAN
    • 13.8.1 COMPANY SNAPSHOT
    • 13.8.2 GEOGRAPHICAL PRESENCE
    • 13.8.3 SERVICE PORTFOLIO
    • 13.8.4 RECENT PROJECTS
  • 13.9 CURRIE & BROWN HOLDINGS LIMITED
    • 13.9.1 COMPANY SNAPSHOT
    • 13.9.2 GEOGRAPHICAL PRESENCE
    • 13.9.3 SERVICE PORTFOLIO
    • 13.9.4 RECENT PROJECT
  • 13.10 FORTIS CONSTRUCTION, INC
    • 13.10.1 COMPANY SNAPSHOT
    • 13.10.2 GEOGRAPHICAL PRESENCE
    • 13.10.3 SERVICE PORTFOLIO
    • 13.10.4 RECENT PROJECTS
  • 13.11 GENSLER
    • 13.11.1 COMPANY SNAPSHOT
    • 13.11.2 GEOGRAPHICAL PRESENCE
    • 13.11.3 REVENUE ANALYSIS
    • 13.11.4 SERVICE PORTFOLIO
    • 13.11.5 RECENT PROJECTS
  • 13.12 HDR
    • 13.12.1 COMPANY SNAPSHOT
    • 13.12.2 GEOGRAPHICAL PRESENCE
    • 13.12.3 SERVICE PORTFOLIO
    • 13.12.4 RECENT PROJECT
  • 13.13 HOLDER CONSTRUCTION COMPANY
    • 13.13.1 COMPANY SNAPSHOT
    • 13.13.2 GEOGRAPHICAL PRESENCE
    • 13.13.3 SERVICE PORTFOLIO
    • 13.13.4 RECENT PROJECT
  • 13.14 ISG PLC
    • 13.14.1 COMPANY SNAPSHOT
    • 13.14.2 GEOGRAPHICAL PRESENCE
    • 13.14.3 REVENUE ANALYSIS
    • 13.14.4 SERVICE PORTFOLIO
    • 13.14.5 RECENT PROJECTS
  • 13.15 JACOBS ENGINEERING GROUP
    • 13.15.1 COMPANY SNAPSHOT
    • 13.15.2 GEOGRAPHICAL PRESENCE
    • 13.15.3 REVENUE ANALYSIS
    • 13.15.4 SERVICE PORTFOLIO
    • 13.15.5 RECENT PROJECT
  • 13.16 JONES ENGINEERING GROUP
    • 13.16.1 COMPANY SNAPSHOT
    • 13.16.2 GEOGRAPHICAL PRESENCE
    • 13.16.3 SERVICE PORTFOLIO
    • 13.16.4 RECENT PROJECT
  • 13.17 PEPPER CONSTRUCTION
    • 13.17.1 COMPANY SNAPSHOT
    • 13.17.2 SERVICE PORTFOLIO
    • 13.17.3 RECENT PROJECT
  • 13.18 ROGERS-O'BRIEN CONSTRUCTION COMPANY, LTD
    • 13.18.1 COMPANY SNAPSHOT
    • 13.18.2 SERVICE PORTFOLIO
    • 13.18.3 RECENT PROJECT
  • 13.19 SKANSKA
    • 13.19.1 COMPANY SNAPSHOT
    • 13.19.2 GEOGRAPHICAL PRESENCE
    • 13.19.3 REVENUE ANALYSIS
    • 13.19.4 SERVICE PORTFOLIO
    • 13.19.5 RECENT PROJECTS
  • 13.20 STRUCTURE TONE
    • 13.20.1 COMPANY SNAPSHOT
    • 13.20.2 GEOGRAPHICAL PRESENCE
    • 13.20.3 SERVICE PORTFOLIO
    • 13.20.4 RECENT PROJECTS
  • 13.21 THE BOLDT COMPANY
    • 13.21.1 COMPANY SNAPSHOT
    • 13.21.2 SERVICE PORTFOLIO
    • 13.21.3 RECENT PROJECT

14 CONCLUSION

15 QUESTIONNAIRE

16 RELATED REPORTS

LIST OF TABLES

  • TABLE 1 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 2 ASIA-PACIFIC ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 3 ASIA-PACIFIC UPS IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 4 ASIA-PACIFIC GENERATORS IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 5 ASIA-PACIFIC RACK POWER DISTRIBUTION UNIT IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 6 ASIA-PACIFIC TRANSFER SWITCHES & SWITCHGEAR IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 7 ASIA-PACIFIC OTHERS IN ELECTRICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 8 ASIA-PACIFIC MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 9 ASIA-PACIFIC COOLING SYSTEM IN MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 10 ASIA-PACIFIC RACKS IN MECHANICAL INFRASTRUCTURE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017-2026 (USD MILLION)
  • TABLE 11 ASIA-PACIFIC GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 12 ASIA-PACIFIC BUILDLING DEVELOPMENT IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 13 ASIA-PACIFIC PHYSICAL SECURITY IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 14 ASIA-PACIFIC DATA CENTER INFRASTRCUTURE MANAGEMENT IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 15 ASIA-PACIFIC BUILDLING DESIGN IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 16 ASIA-PACIFIC INSTALLATION AND COMMISSIONING SERVICES IN GENERAL CONSTRUCTION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 17 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017- 2026 (USD MILLION)
  • TABLE 18 ASIA-PACIFIC TIER 1 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 19 ASIA-PACIFIC TIER 2 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 20 ASIA-PACIFIC TIER 3 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 21 ASIA-PACIFIC TIER 4 IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 22 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017- 2026 (USD MILLION)
  • TABLE 23 ASIA-PACIFIC SMALL SIZE ORGANIZATION DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 24 ASIA-PACIFIC MEDIUM SIZE ORGANIZATION DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 25 ASIA-PACIFIC LARGE SIZE ORGANIZATION DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 26 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017- 2026 (USD MILLION)
  • TABLE 27 ASIA-PACIFIC BANKING FINANCE SERVICES AND INSURANCE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 28 ASIA-PACIFIC IT & TELECOMMUNICATIONS IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 29 ASIA-PACIFIC GOVERNMENT & DEFENSE DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 30 ASIA-PACIFIC HEALTHCARE IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 31 ASIA-PACIFIC RETAIL COLOCATION IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 32 ASIA-PACIFIC POWER & ENERGY IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 33 ASIA-PACIFIC MANUFACTURING IN DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 34 ASIA-PACIFIC OTHERS DATA CENTER CONSTRUCTION MARKET, BY REGION, 2017- 2026 (USD MILLION)
  • TABLE 35 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY COUNTRY, 2017-2026 (USD MILLION)
  • TABLE 36 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 37 ASIA-PACIFIC ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 38 ASIA-PACIFIC MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 39 ASIA-PACIFIC COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 40 ASIA-PACIFIC GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 41 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 42 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 43 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 44 JAPAN DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 45 JAPAN ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 46 JAPAN MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 47 JAPAN COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 48 JAPAN GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 49 JAPAN DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 50 JAPAN DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 51 JAPAN DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 52 CHINA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 53 CHINA ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 54 CHINA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 55 CHINA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 56 CHINA GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 57 CHINA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 58 CHINA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 59 CHINA DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 60 AUSTRALIA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 61 AUSTRALIA ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 62 AUSTRALIA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 63 AUSTRALIA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 64 AUSTRALIA GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 65 AUSTRALIA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 66 AUSTRALIA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 67 AUSTRALIA DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 68 INDIA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 69 INDIA ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 70 INDIA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 71 INDIA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 72 INDIA GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 73 INDIA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 74 INDIA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 75 INDIA DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 76 SINGAPORE DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 77 SINGAPORE ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 78 SINGAPORE MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 79 SINGAPORE COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 80 SINGAPORE GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 81 SINGAPORE DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 82 SINGAPORE DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 83 SINGAPORE DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 84 HONG KONG DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 85 HONG KONG ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 86 HONG KONG MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 87 HONG KONG COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 88 HONG KONG GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 89 HONG KONG DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 90 HONG KONG DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 91 HONG KONG DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 92 INDONESIA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 93 INDONESIA ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 94 INDONESIA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 95 INDONESIA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 96 INDONESIA GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 97 INDONESIA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 98 INDONESIA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 99 INDONESIA DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 100 THAILAND DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 101 THAILAND ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 102 THAILAND MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 103 THAILAND COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 104 THAILAND GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 105 THAILAND DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 106 THAILAND DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 107 THAILAND DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 108 PHILIPPINES DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 109 PHILIPPINES ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 110 PHILIPPINES MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE , 2017-2026 (USD MILLION)
  • TABLE 111 PHILIPPINES COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 112 PHILIPPINES GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 113 PHILIPPINES DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 114 PHILIPPINES DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 115 PHILIPPINES DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 116 SOUTH KOREA DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)
  • TABLE 117 SOUTH KOREA ELECTRICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 118 SOUTH KOREA MECHANICAL INFRASTRUCTURE DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 119 SOUTH KOREA COOLING SYSTEM DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 120 SOUTH KOREA GENERAL CONSTRUCTION DATA CENTER CONSTRUCTION MARKET, BY TYPE, 2017-2026 (USD MILLION)
  • TABLE 121 SOUTH KOREA DATA CENTER CONSTRUCTION MARKET, BY DATA CENTER TYPE, 2017-2026 (USD MILLION)
  • TABLE 122 SOUTH KOREA DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2017-2026 (USD MILLION)
  • TABLE 123 SOUTH KOREA DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2017-2026 (USD MILLION)
  • TABLE 124 REST OF ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2017-2026 (USD MILLION)

LIST OF FIGURES

  • FIGURE 1 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: SEGMENTATION
  • FIGURE 2 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: DATA TRIANGULATION
  • FIGURE 3 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: DROC ANALYSIS
  • FIGURE 4 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: ASIA-PACIFIC VS REGIONAL MARKET ANALYSIS
  • FIGURE 5 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: COMPANY RESEARCH ANALYSIS
  • FIGURE 6 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: INTERVIEW DEMOGRAPHICS
  • FIGURE 7 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: DBMR MARKET POSITION GRID
  • FIGURE 8 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: THE CATEGORY VS TIME GRID
  • FIGURE 9 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: THE MARKET CHALLENGE MATRIX
  • FIGURE 10 DRIVERS, RESTRAINTS, OPPORTUNITIES, AND CHALLENGES OF ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET
  • FIGURE 11 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: SEGMENTATION
  • FIGURE 12 RISING CONSTRUCTION OF HYPERSCALE DATA CENTERS IS ONE OF THE MAJOR FACTOR DRIVE THE GROWTH OF THE ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET IN THE FORECAST PERIOD OF 2019 TO 2026
  • FIGURE 13 ELECTRICAL INFRASTRUCTURE TYPE IS EXPECTED TO ACCOUNT FOR THE LARGEST SHARE OF THE ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET IN 2019 & 2026
  • FIGURE 14 ASIA-PACIFIC IS GROWING AT HIGHEST CAGR FOR ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET MANUFACTURERS IN THE FORECAST PERIOD OF 2019 TO 2026
  • FIGURE 15 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE, 2018
  • FIGURE 16 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, DATA CENTER TYPE, 2018
  • FIGURE 17 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY ORGANIZATION SIZE, 2018
  • FIGURE 18 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY VERTICAL, 2018
  • FIGURE 19 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: SNAPSHOT (2018)
  • FIGURE 20 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: BY COUNTRY (2018)
  • FIGURE 21 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: BY COUNTRY (2019 & 2026)
  • FIGURE 22 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY COUNTRY (2018 & 2026)
  • FIGURE 23 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET, BY INFRASTRUCTURE TYPE (2019 -2026)
  • FIGURE 24 ASIA-PACIFIC DATA CENTER CONSTRUCTION MARKET: COMPANY SHARE 2018 (%)
Back to Top