Cover Image
Market Research Report

Data Center Solutions Market by Electrical Solution, Mechanical Solution, Service (Consulting, System Integration & Professional), Vertical, User Type, and Region - Global Forecast to 2020

Published by MarketsandMarkets Product code 317095
Published Content info 128 Pages
Delivery time: 1-2 business days
Price
Back to Top
Data Center Solutions Market by Electrical Solution, Mechanical Solution, Service (Consulting, System Integration & Professional), Vertical, User Type, and Region - Global Forecast to 2020
Published: November 24, 2015 Content info: 128 Pages
Description

Increasing demand for data center construction is driving the need of data center solution

Factors such as growing usage of mobile data and smart devices, and rich connectivity of internet and data storage in various industries is surging the growth of data centers. Enormous data is generated on a daily basis, which requires additional or increased storage space thus leading the growth of the data centers. Additionally, many companies are moving toward cloud-based models due to increasing data storage requirements. Also, companies are implementing digitalization; therefore, to generate electronic records from old written records is also creating the need for data storage solutions. Moreover, data centers are witnessing rapid change and organizations are implementing equipment refresh cycle by adding or removing assets due to technological advancements. The requirement for storage space increases the demand for associated data center assets and power and cooling solutions. Increasing data centers increases the amount of heat generated in data processing and thus creates the need for efficient data center power and cooling solutions.

Asia-Pacific is expected to witness highest market growth

The market in APAC data center solution is in the growth phase and is the fastest-growing region of the global data center solution market. This is mainly contributed to the growing focus of the market players to address the demands of data center solution in this region. On the other hand, the Middle East and Africa (MEA) region is still in the introductory phase in terms of adoption of data center solution.

The primary participants in this study are 20% from tier 1 companies, 35% from tier 2 companies, and 45% from tier 3 companies. Moreover, these primary participants are 27% from C-Level executives, 55% from Director-Level and 18% other designated professionals.

Major players in the data center solution market are Schneider Electric, ABB, Emerson Electric, Rittal, Black Box Corporation, Eaton, Delta Electronics, Tripp Lite, HP, and Siemens AG. Companies offer high-performance data center solution to increase system availability, reduce energy costs, ramp up efficiency, and provide real value to the data centers for their users.

Reasons to Buy the Report:

From an insight perspective, this research report has focused on various levels of analysis-industry analysis (industry trends, and Porter analysis), analysis of top players, their offered products and services, supply chain analysis, and company profiles, which together comprise and discuss the basic views on the competitive landscape, emerging and high-growth segments of the network analytics market, high-growth regions, drivers, restraints, and opportunities.

The report will enrich both established firms as well as new entrants/smaller firms to gauge the pulse of the market, which in turn will help the firms in garnering a greater market share. Firms purchasing the report could use any one or combination of the below mentioned five strategies (market penetration, product development/innovation, market development, market diversification, and competitive assessment) for strengthening their market share.

The report provides insights on the following pointers:

  • Market Penetration: Comprehensive information on micro data center solutions offered by the top 10 players in the data center solution market
  • Product Development/Innovation: Detailed insights on upcoming technologies, research and development (R&D) activities, and new product launches in the data center solution market
  • Market Development: Comprehensive information about lucrative emerging markets. The report analyzes the markets for data center solution across various regions
  • Market Diversification: Exhaustive information about new products, untapped regions, recent developments, and investments in the data center solution market
  • Competitive Assessment: In-depth assessment of market shares, strategies, products, and capabilities of leading players in the data center solution market.
Table of Contents
Product Code: TC 2783

TABLE OF CONTENTS

1. INTRODUCTION

  • 1.1. OBJECTIVES OF THE STUDY
  • 1.2. MARKET DEFINITION
  • 1.3. MARKET SCOPE
    • 1.3.1. MARKET COVERED
    • 1.3.2. YEARS CONSIDERED IN THE REPORT
  • 1.4. CURRENCY AND PRICING
  • 1.5. LIMITATIONS
  • 1.6. STAKEHOLDERS

2. RESEARCH METHODOLOGY

  • 2.1. RESEARCH DATA
    • 2.1.1. SECONDARY DATA
      • 2.1.1.1. Key data from secondary sources
    • 2.1.2. PRIMARY DATA
      • 2.1.2.1. Key data from primary sources
      • 2.1.2.2. Key industry insights
      • 2.1.2.3. Breakdown of primaries
  • 2.2. MARKET SIZE ESTIMATION
    • 2.2.1. BOTTOM-UP APPROACH
    • 2.2.2. TOP-DOWN APPROACH
  • 2.3. MARKET BREAKDOWN AND DATA TRIANGULATION
  • 2.4. RESEARCH ASSUMPTIONS

3. EXECUTIVE SUMMARY

4. PREMIUM INSIGHTS

  • 4.1. ATTRACTIVE MARKET OPPORTUNITIES IN THE DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET
  • 4.2. DATA CENTER ELECTRICAL & MECHANICAL SOLUTIONS MARKET: BY SOLUTION
  • 4.3. DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET: MARKET SHARE OF TOTAL MARKET AND TOP THREE VERTICALS
  • 4.4. LIFECYCLE ANALYSIS, BY REGION

5. MARKET OVERVIEW

  • 5.1. INTRODUCTION
  • 5.2. MARKET SEGMENTATION
  • 5.3. MARKET DYNAMICS
    • 5.3.1. DRIVERS
      • 5.3.1.1. Increasing demand for data centers
      • 5.3.1.2. Minimizing carbon emission and environmental impacts
      • 5.3.1.3. Lower degree of downtime
    • 5.3.2. RESTRAINTS
      • 5.3.2.1. High initial investment costs
      • 5.3.2.2. Low awareness regarding the availability of energy efficient solutions
    • 5.3.3. OPPORTUNITIES
      • 5.3.3.1. Green data center with energy efficient solutions
    • 5.3.4. CHALLENGES
      • 5.3.4.1. Compatibility of solutions

6. INDUSTRY TRENDS

  • 6.1. INTRODUCTION
  • 6.2. ECOSYSTEM FOR DATA CENTER EFFICIENCY
  • 6.3. TECHNOLOGY, TRENDS AND STANDARDS
    • 6.3.1. INTRODUCTION
    • 6.3.2. INFRASTRUCTURE STANDARDS AND GUIDELINES FOR DATA CENTER
      • 6.3.2.1. Canadian Standards Association (CSA)
      • 6.3.2.2. Factory Mutual (FM) Approved
      • 6.3.2.3. Health Insurance Portability and Accountability Act of 1996(HIPAA)
      • 6.3.2.4. Made in USA (For U.S. Region)
      • 6.3.2.5. National Electrical Manufacturers Association (NEMA)
      • 6.3.2.6. Telecommunication Industry Association (TIA)
      • 6.3.2.7. Underwriters Laboratory (UL)
  • 6.4. STRATEGIC OVERVIEW
    • 6.4.1. INNOVATION AND PRODUCT ENHANCEMENTS
    • 6.4.2. ACQUISITIONS, COLLABORATIONS, AND PARTNERSHIPS

7. DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET ANALYSIS, BY ELECTRICAL SOLUTION

  • 7.1. INTRODUCTION
  • 7.2. POWER DISTRIBUTION AND MEASUREMENT
  • 7.3. POWER BACKUP
  • 7.4. CABLING INFRASTRUCTURE

8. DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET ANALYSIS, BY MECHANICAL SOLUTION

  • 8.1. INTRODUCTION
  • 8.2. AIR-CONDITIONING
  • 8.3. CHILLERS
  • 8.4. ECONOMIZERS
  • 8.5. COOLING TOWERS
  • 8.6. SERVER COOLING
  • 8.7. MANAGEMENT SYSTEMS
  • 8.8. OTHERS

9. DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET ANALYSIS, BY SERVICE

  • 9.1. INTRODUCTION
  • 9.2. CONSULTING SERVICES
  • 9.3. SYSTEM INTEGRATION SERVICES
  • 9.4. PROFESSIONAL SERVICES

10. DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET ANALYSIS, BY USER TYPE

  • 10.1. INTRODUCTION
  • 10.2. MID-SIZE DATA CENTERS
  • 10.3. ENTERPRISE DATA CENTERS
  • 10.4. LARGE DATA CENTERS

11. DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET ANALYSIS, BY VERTICAL

  • 11.1. INTRODUCTION
  • 11.2. BANKING, FINANCIAL SERVICES, AND INSURANCE (BFSI)
  • 11.3. TELECOM AND IT
  • 11.4. GOVERNMENT
  • 11.5. ENERGY
  • 11.6. HEALTHCARE
  • 11.7. OTHERS

12. GEOGRAPHIC ANALYSIS

  • 12.1. INTRODUCTION
  • 12.2. NORTH AMERICA
  • 12.3. EUROPE
  • 12.4. ASIA-PACIFIC
  • 12.5. MIDDLE EAST AND AFRICA
  • 12.6. LATIN AMERICA

13. COMPETITIVE LANDSCAPE

  • 13.1. OVERVIEW
  • 13.2. COMPETITIVE SITUATION AND TRENDS
  • 13.3. NEW PRODUCT LAUNCHES
  • 13.4. PARTNERSHIPS AND COLLABORATIONS
  • 13.5. ACQUISITIONS

14. COMPANY PROFILES (Business Overview, Products & Services, Key Insights, Recent Developments, SWOT Analysis, MnM View)*

  • 14.1. INTRODUCTION
  • 14.2. ABB LTD.
  • 14.3. EATON CORPORATION
  • 14.4. EMERSON ELECTRIC CO.
  • 14.5. SCHNEIDER ELECTRIC
  • 14.6. RITTAL GMBH & CO. KG
  • 14.7. HEWLETT-PACKARD DEVELOPMENT COMPANY, L.P.
  • 14.8. SIEMENS AG
  • 14.9. DELTA ELECTRONICS, INC.
  • 14.10. BLACK BOX CORPORATION
  • 14.11. TRIPP LITE

*Details on Business Overview, Products & Services, Key Insights, Recent Developments, SWOT Analysis, MnM View might not be captured in case of unlisted companies.

15. APPENDIX

  • 15.1. INSIGHTS OF INDUSTRY EXPERTS
  • 15.2. DISCUSSION GUIDE
  • 15.3. INTRODUCING RT: REAL-TIME MARKET INTELLIGENCE
  • 15.4. AVAILABLE CUSTOMIZATIONS
  • 15.5. RELATED REPORTS

LIST OF TABLES

  • TABLE 1: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET: ASSUMPTIONS
  • TABLE 2: DATA CENTER ELECTRICAL AND MECHNANICAL SOLUTIONS MARKET SIZE AND GROWTH RATE, 2013-2020 (USD BILLION, Y-O-Y %)
  • TABLE 3: THE EFFICIENCY OF DATA CENTERS BY CALCULATING AND COMPARING THE PUE AND DCIE VALUES,
  • TABLE 4: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY ELECTRICAL SOLUTION, 2013-2020 (USD BILLION)
  • TABLE 5: POWER DISTRIBUTION AND MEASUREMENT: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 6: POWER BACKUP: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD BILLION)
  • TABLE 7: CABLING INFRASTRUCTURE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 8: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY MECHANICAL SOLUTION, 2013-2020 (USD BILLION)
  • TABLE 9: AIR CONDITIONING: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 10: CHILLERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 11: ECONOMIZERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 12: COOLING TOWERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 13: SERVER COOLING: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 14: MANAGEMENT SYSTEMS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 15: OTHERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 16: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY SERVICE, 2013-2020 (USD BILLION)
  • TABLE 17: CONSULTING SERVICES: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 18: SYSTEM INTEGRATION SERVICES:DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 19: PROFESSIONAL SERVICES: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 20: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 21: ELECTRICAL SOLUTIONS: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 22: MECHANICAL SOLUTIONS: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 23: MID-SIZE DATA CENTERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 24: ENTERPRISE DATA CENTERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 25: LARGE DATA CENTERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 26: GLOBAL DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY VERTICAL, 2013-2020 (USD BILLION)
  • TABLE 27: BFSI: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD BILLION)
  • TABLE 28: TELECOM AND IT: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 29: GOVERNMENT: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 30: ENERGY: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 31: HEALTHCARE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 32: OTHERS: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD MILLION)
  • TABLE 33: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY REGION, 2013-2020 (USD BILLION)
  • TABLE 34: NORTH AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY TYPE, 2013-2020 (USD BILLION)
  • TABLE 35: NORTH AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY ELECTRICAL SOLUTION, 2013-2020 (USD BILLION)
  • TABLE 36: NORTH AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY MECHANICAL SOLUTION, 2013-2020 (USD MILLION)
  • TABLE 37: NORTH AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY SERVICE, 2013-2020 (USD BILLION)
  • TABLE 38: NORTH AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY VERTICAL, 2013-2020 (USD BILLION)
  • TABLE 39: NORTH AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 40: EUROPE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY TYPE, 2013-2020 (USD BILLION)
  • TABLE 41: EUROPE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY ELECTRICAL SOLUTION, 2013-2020 (USD BILLION)
  • TABLE 42: EUROPE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY MECHANICAL SOLUTION, 2013-2020 (USD BILLION)
  • TABLE 43: EUROPE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY SERVICE, 2013-2020 (USD BILLION)
  • TABLE 44: EUROPE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY VERTICAL, 2013-2020 (USD BILLION)
  • TABLE 45: EUROPE: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 46: ASIA-PACIFIC: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY TYPE, 2013-2020 (USD BILLION)
  • TABLE 47: ASIA-PACIFIC: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY ELECTRICAL SOLUTION, 2013-2020 (USD BILLION)
  • TABLE 48: ASIA-PACIFIC: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY MECHANICAL SOLUTION, 2013-2020 (USD MILLION)
  • TABLE 49: ASIA-PACIFIC: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY SERVICE, 2013-2020 (USD BILLION)
  • TABLE 50: ASIA-PACIFIC: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY VERTICAL, 2013-2020 (USD BILLION)
  • TABLE 51: ASIA-PACIFIC: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 52: MIDDLE EAST AND AFRICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY TYPE, 2013-2020 (USD BILLION)
  • TABLE 53: MIDDLE EAST AND AFRICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY ELECTRICAL SOLUTION, 2013-2020 (USD MILLION)
  • TABLE 54: MIDDLE EAST AND AFRICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY MECHANICAL SOLUTION, 2013-2020 (USD MILLION)
  • TABLE 55: MIDDLE EAST AND AFRICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY SERVICE, 2013-2020 (USD MILLION)
  • TABLE 56: MIDDLE EAST AND AFRICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY VERTICAL, 2013-2020 (USD MILLION)
  • TABLE 57: MIDDLE EAST AND AFRICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 58: LATIN AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY TYPE, 2013-2020 (USD BILLION)
  • TABLE 59: LATIN AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY ELECTRICAL SOLUTION, 2013-2020 (USD BILLION)
  • TABLE 60: LATIN AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY MECHANICAL SOLUTION, 2013-2020 (USD MILLION)
  • TABLE 61: LATIN AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY SERVICE, 2013-2020 (USD MILLION)
  • TABLE 62: LATIN AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY VERTICAL, 2013-2020 (USD MILLION)
  • TABLE 63: LATIN AMERICA: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET SIZE, BY USER TYPE, 2013-2020 (USD BILLION)
  • TABLE 64: NEW PRODUCT LAUNCHES, 2013-2015
  • TABLE 65: PARTNERSHIPS AND COLLABORATIONS, 2012-2015
  • TABLE 66: ACQUISITIONS, 2013-2015

LIST OF FIGURES

  • FIGURE 1: MARKET SEGMENTATION: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET
  • FIGURE 2: RESEARCH DESIGN
  • FIGURE 3: BREAKDOWN OF PRIMARY INTERVIEWS: BY COMPANY, DESIGNATION, AND REGION
  • FIGURE 4: MARKET SIZE ESTIMATION METHODOLOGY: BOTTOM-UP APPROACH
  • FIGURE 5: MARKET SIZE ESTIMATION METHODOLOGY: TOP-DOWN APPROACH
  • FIGURE 6: DATA TRIANGULATION
  • FIGURE 7: NORTH AMERICA IS EXPECTED TO HOLD THE LARGEST MARKET SHARE IN 2015
  • FIGURE 8: DATA CENTER MECHANICAL SOLUTIONS MARKET EXPECTED TO GROW AT THE HIGHEST CAGR IN APAC DURING THE FORECAST PERIOD
  • FIGURE 9: TOP THREE SEGMENTS IN TERMS OF MARKET SHARE FOR DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET 2015-2020
  • FIGURE 10: GROWTH TREND OF DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET
  • FIGURE 11: MECHANICAL SOLUTIONS CONTRIBUTES TO THE HIGHEST MARKET OPPORTUNITIES OF THE DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET
  • FIGURE 12: TELECOM AND IT IS EXPECTED TO HOLD THE LARGEST MARKTE SHARE AMONG ALL THE VERTICALS IN DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET
  • FIGURE 13: ASIA-PACIFIC IS EXPECTED TO REGISTER THE HIGHEST CAGR IN THE DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET DURING THE FORECAST PERIOD
  • FIGURE 14: GEOGRAPHIC LIFECYCLE ANALYSIS (2015): ASIA-PACIFIC MARKET IS EXPECTEED TO BE THE FASTEST GROWING MARKET IN THE COMING YEARS
  • FIGURE 15: DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET: DRIVERS, RESTRAINTS, OPPORTUNITIES, AND CHALLENGES
  • FIGURE 16: DATA CENTER POWER UTILIZATION FRAMEWORK
  • FIGURE 17: STRATEGIC BENCHMARKING: PRODUCT INNOVATION AND ENHANCEMENTS
  • FIGURE 18: STRATEGIC BENCHMARKING: SCHNEIDER ELECTRIC DEPICTS SRONG STRATEGIC INTEGRATION IN THE MARKET
  • FIGURE 19: POWER BACKUP EXPECTED TO LEAD THE DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET
  • FIGURE 20: SERVER COOLING SOLUTION EXPECTED TO GROW AT THE HIGHEST CAGR DURING THE FORECAST PERIOD
  • FIGURE 21: CONSULTING SERVICES IS EXPECTED TO HOLD THE LARGEST MARKET SHARE IN 2020
  • FIGURE 22: LARGE ENTERPRISES SEGMENT EXPECTED TO HOLD THE LARGEST MARKET SIZE DURING THE FORECAST PERIOD
  • FIGURE 23: TELECOM AND IT VERTICAL EXPECTED TO HOLD THE LARGEST MARKET SIZE OF THE DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET
  • FIGURE 24: GEOGRAPHIC SNAPSHOT (2015): ASIA-PACIFIC IS EMERGING AS A NEW HOTSPOT
  • FIGURE 25: NORTH AMERICA IS EXPECTED TO DOMINATE THE DATA CENTER ELECTRICAL AND MECHANICAL SOLUTIONS MARKET IN 2015
  • FIGURE 26: NORTH AMERICA MARKET: SNAPSHOT
  • FIGURE 27: ASIA-PACIFIC MARKET: SNAPSHOT
  • FIGURE 28: COMPANIES ADOPTED NEW PRODUCT LAUNCH AS THE KEY GROWTH STRATEGY FROM 2013 TO 2015
  • FIGURE 29: NEW PRODUCT LAUNCH WAS THE KEY STRATEGY ADOPTED BY THE MAJOR MARKET PLAYERS FROM 2013 TO 2015
  • FIGURE 30: BATTLE FOR MARKET SHARE: NEW PRODUCT LAUNCH IS THE KEY STRATEGY FOLLOWED BY PSRTNERSHIPS AND COLLABORATIONS
  • FIGURE 31: GEOGRAPHIC REVENUE MIX OF TOP MARKET PLAYERS
  • FIGURE 32: ABB LTD: COMPANY SNAPSHOT
  • FIGURE 33: ABB LTD : SWOT ANALYSIS
  • FIGURE 34: EATON CORPORATION: COMPANY SNAPSHOT
  • FIGURE 35: EATON CORPORATION: SWOT ANALYSIS
  • FIGURE 36: EMERSON ELECTRIC CO.: COMPANY SNAPSHOT
  • FIGURE 37: EMERSON ELECTRIC CO.: SWOT ANALYSIS
  • FIGURE 38: SCHNEIDER ELECTRIC: COMPANY SNAPSHOT
  • FIGURE 39: SCHNEIDER ELECTRIC: SWOT ANALYSIS
  • FIGURE 40: HP: COMPANY SNAPSHOT
  • FIGURE 41: SIEMENS AG: COMPANY SNAPSHOT
  • FIGURE 42: DELTA ELECTRONICS, INC.: COMPANY SNAPSHOT
  • FIGURE 43: BLACK BOX CORPORATION: COMPANY SNAPSHOT
Back to Top