SEARCH
What are you looking for?
Need help finding what you are looking for? Contact Us
Compare

PUBLISHER: Global Infrastructure Sherpa | PRODUCT CODE: 2172831

Cover Image

PUBLISHER: Global Infrastructure Sherpa | PRODUCT CODE: 2172831

Sherpa Atlas - Subscription Map Platform: Mapping the Globe's Infrastructure Assets

PUBLISHED: annual subscription
PAGES:
DELIVERY TIME:
SELECT AN OPTION
One Country - Annual Subscription (Single User License)
USD 3840
One Country - Annual Subscription (Team License - Up to 5 Users)
USD 9600
One Country - Annual Subscription (Enterprise License)
USD 19200
Global Access - Annual Subscription (Single User License)
USD 20000
Global Access - Annual Subscription (Team License - Up to 5 Users)
USD 50000
Global Access - Annual Subscription (Enterprise License)
USD 100000

Add to Cart

WHAT IT IS

A subscription map of the assets, the networks they depend on and their owners

Sherpa Atlas draws the high-voltage network across the globe, on satellite or mapbase, and puts substations, grid upgrades, connection queues, data centres, district-heating networks, fibre sites and wind farms on the same view. Each point opens arecord: capacity, status, ownership, permitting milestones and the dataset the figurewas taken from, with the date it was read.

Capacity measures are kept apart rather than added together, so an operatinginstallation, queued demand, reserved power and a stated development target arenever read as the same thing.

9 / markets covered record by record

12 / datasets

8 / layers on one view

THE EIGHT LAYERS

  • GRID
    • Power lines by voltage band worldwide; substations by voltage, with operator,area and state
  • REINFORCEMENT
    • Grid upgrades and transmission projects, named and dated
  • DEMAND
    • Connection queues and reserved capacity, by area and by requester
  • DATA CENTRES
    • Announced, under construction and operating, with company, commune andcapacity as stated
  • HEAT AND FIBRE
    • District-heating networks, internet exchanges, carrier-neutral sites and cablelandings
  • WIND
    • Operating plants and projects by permitting stage, with owner groups

THE GRID

The transmission network is alreadydrawn, everywhere, at every zoom

Power lines are carried on the map worldwide and coloured by voltage band: 450 kV andabove, 300–449, 200–299 and 100–199. They stay on the view at every zoom and oversatellite imagery, so a site, its substations and the lines that reach it are read togetherrather than in separate tools.

Inside the nine covered markets, every substation, upgrade, queue entry, data centre, heatnetwork, fibre site and wind asset behind those lines carries a record of its own.

4 / voltage bandsdrawn

2 / base maps: satellite or map, withterrain

9 / markets with records behind thelines

HOW IT WORKS

Two choices at the entrance: where to look, and what to put on the map

  • 1. Choose the market
    • One market, several or all of them at once. Coverage and detail vary by country and dataset.
  • 2. Choose the layers
    • Grid, demand, data centres, heat, fibre and wind overlay on the same view, with the same filters appliedacross every market selected.
  • 3. Click a point or an area
    • The record opens beside the map, with the assets around it and the distances between them.
  • 4. Open the market workspace
    • The same data as sortable tables and charts. Filters act on the map, the records and the tables together, sowhat stays on screen is the comparison list.

Points are sized by capacity and coloured by status. Areas are shaded by the demand already queued in them, so thepattern across a country reads before any filter is applied.

THE RECORD

Campus IA at Fouju: 1.4 GW under construction, 2 km from a 225 kV substation

The record names the group behind the site - MGX, Bpifrance, MistralAI and Nvidia - the commune of Fouju in Seine-et-Marne, the statusunder construction, the capacity as stated at 1.4 GW and theannouncement date of February 2025.

Around it: the Almont–Montaigu district-heating network 7 km away,France-IX Paris and OPCORE DC2 at 35 km, the Saint-Hilaire-de-Riezcable landing at 410 km, and the three nearest substations at Moisenay,Courtry and L'Etang.

Sites are shown at the town centre, the exact location may differ, and the facts come frompublic announcements. Where a grid operator publishes connection requests only as zonaltotals, the record says so rather than apportioning them.

THE MARKET WORKSPACE

Headline figures along the top, filters down the side, the whole market in tabs

FRANCE / GRID & DATA CENTRES

  • MAP
    • Substations and data centres, coloured by powerdrawn or power fed in
  • STATIONS
    • 3,973 transmission and high-voltage stations
  • DEPARTEMENTS
    • 96, shaded by RTE pooling-zone status
  • PLANTS
    • 415 plants and large consumers
  • DATA CENTRES
    • 153 sites, with group, commune and capacity asstated
  • CONNECTION MARKET
    • Reserved and available capacity, zone by zone

DEPTH OF THE DATA

92.8 GW of generation and storage registered asplanned in Germany, 74 plants of 100 MW or more

  • ~270 GW
    • connection requests held by the four transmissionoperators (Feb 2026)
  • 13 GW
    • of the planned capacity isbattery storage

Germany maps 3,608 substations of 110 kV and above, 401 districts, 6,221 plants andlarge consumers, 3,673 owners, 256 data centres and 103 connectivity sites. Everyplant on the high-voltage grid is listed with owner, status, MW, start date, voltagelevel and grid operator, and the charts break the planned capacity down bytechnology and by planned start. Plants owned by private persons are shown by typeand municipality, without the owner.

COVERAGE

Twelve datasets across nine markets, bought separately or together

MARKET / DATASET

  • Norway
    • Grid & data centres
  • Sweden
    • Grid & data centres
  • Denmark
    • Grid & data centres
  • Finland
    • Grid & data centres
  • Germany
    • Grid & data centres
  • Benelux
    • Grid & data centres
  • France
    • Grid & data centres
  • Italy
    • Grid & data centres
  • Italy
    • Wind farms
  • United States
    • Data-centre campuses · free preview
  • Pacific Northwest
    • BPA · Grid & data centres
  • Texas
    • ERCOT · Grid & data centres

WHAT THE MARKETS STATE

Queued demand, reserved capacity and permitting outcomes, market by market

MARKET

  • Norway
  • Sweden
  • Denmark
  • Finland
  • France
  • Italy
  • Texas

WHAT THE PLATFORM STATES TODAY

  • Norway:15,777 MW queued across 240 cases, 58% of it data centres; 8,164 MW reserved across 214 cases; median wait 12 months
  • Sweden:25,801 MW of consumption in the transmission queue, 7,326 MW of it data centres; 5,910 MW reserved on preliminary decision
  • Denmark:About 60 GW of new consumption queued (Mar 2026) against a peak near 7 GW; 34,989 MW in the Energinet queue map (Jun 2026)
  • Finland:68 GW of consumption enquiries in twelve months (Jul 2026); 5 GW of data-centre capacity with signed agreements (Aug 2026)
  • France:Nearly 18 GW reserved by data-centre projects on the transmission grid (RTE, Jun 2026); 3,585 MW still available in the Dunkerque pooling zone
  • Italy:Wind: 348 operating plants at 8,456 MW; 946 projects at 58,797 MW filed; 608 filings under review; 75 refusals; 27 FER-X 2025 awards
  • Texas:463 GW of large loads seeking connection by 2030 (ERCOT, Jun 2026); 419 GW of generation and storage in study or agreed

MAPPED

  • Norway:129 stations
  • Sweden:674 stations・21 counties
  • Denmark:161 stations・5 regions
  • Finland:789 stations・18 regions
  • France:3,973 stations・153 data centres
  • Italy:1,261 records・515 owner groups
  • Texas:2,197 stations・140 campuses

Germany, Benelux and Italy · Grid & data centres and the Pacific Northwest carry the same structure. Figures are what each operator or registerpublishes, not an estimate built from them.

THE SAME STRUCTURE, MARKET BY MARKET

Grid and data centres in Europe and the United States, onshore wind in Italy

Texas (ERCOT): counties shaded by announced data-centre capacity, with substations, campuses and zones.1,379 transmission projects listed.

Italy · Wind farms: records sized by MW and coloured by permitting stage, from the Italian Onshore WindRegister, edition 1 of 17 October 2026.

WHO USES IT

Developers, operators, investors, lenders, advisers and utilities

  • Screen locations and build a shortlist
    • Examine the infrastructure around candidate sites, comparealternatives and decide which locations justify a site visit or acommercial approach.
  • Identify dependencies earlier
    • Check competing demand for grid access, planned reinforcementand the status of neighbouring assets, then frame diligence aroundwhat affects delivery.
  • Assess development pipelines
    • Separate operating assets from projects at each stage, see wheredevelopment is concentrated and compare capacity across regionsand owners.
  • Find owners and counterparties
    • Identify who is active in a market, examine portfolios by operating andfiled capacity, and prepare targeted acquisition or originationdiscussions.
  • Work across sectors
    • View data centres, power networks, fibre and district heatingtogether, including connectivity options and recovered-heatopportunities.
  • Prepare market assessments
    • Move between market totals and individual records to structurecomparisons and set out the questions that need answering next.
Have a question?
Picture

Jeroen Van Heghe

Manager - EMEA

+32-2-535-7543

Picture

Christine Sirois

Manager - Americas

+1-860-674-8796

Questions? Please give us a call or visit the contact form.
Hi, how can we help?
Contact us!