According to Mordor Intelligence, the Europe data center grid infrastructure and interconnection market size is projected to expand from USD 8.42 billion in 2026 to USD 9.83 billion in 2027, and to USD 18.34 billion by 2032, registering a CAGR of 13.28% between 2027 and 2032.

AI workloads require more than 7 times the power of conventional data center operations. Data center electricity use increased 17% in 2025, while AI-focused facilities expanded faster. Rack densities are moving from 10 kW toward 40-100 kW per rack. New campuses, therefore, need high-voltage or extra-high-voltage connections, larger transformers, stronger switchgear, and wider cables. Grid connection, control, and monitoring systems are projected to expand at a 14.29% CAGR through 2032. ENTSO-E has identified stability risks that conventional supervisory systems may not detect quickly enough.
EU-27 installed data center capacity reached 9.9 GW of IT power supply in 2024. Cloud migration, public digital services, and legacy system replacement are creating connection requests outside major hubs. Many requests range from 5-50 MW and support upgrades to existing connections and substations. Older colocation facilities may need additional capacity as tenants add cloud and AI workloads. Schneider Electric reported accelerating data center orders in late 2025, with strength expected through 2026. This distributed demand supports work even when large greenfield projects face connection queues.
Data center projects had requested 73 GW of grid capacity in the United Kingdom by mid-2025, compared with a peak demand of 45 GW. Not every project can therefore receive capacity on the requested timetable. Connection waits in major European hubs range from 7 to 10 years, with some delays reaching 13 years. Congestion cost the European Union EUR 4.3 billion (USD 4.80 billion) in 2024, excluding indirect project-delay costs. Capacity access is increasingly affecting hyperscaler location decisions. This favors locations with workable connection rules and available network capacity.
Other drivers and restraints analyzed in the detailed report include:
For complete list of drivers and restraints, kindly check the Table Of Contents.
New grid connections held 43.12% of the Europe data center grid infrastructure and interconnection market share in 2026. The share reflects the volume of greenfield campuses entering development across Europe. Amazon committed EUR 33.7 billion (USD 39.8 billion) to a Spanish data center and AI infrastructure in March 2026. Blackstone also announced EUR 4.3 billion (USD 5.03 billion) for a further Aragon development phase in August 2025. These projects require dedicated grid connections, substations, and construction services.
Existing connection upgrades support demand as colocation and enterprise sites increase contracted capacity. Dedicated transmission infrastructure is more relevant for campuses distant from available network capacity. Transmission lines and cables are projected to expand at a 14.11% CAGR through 2032. In constrained hubs, the mix shifts toward costly upgrades and dedicated infrastructure. In emerging locations, new connections can have higher revenue per MW but require more engineering and permitting. The Europe data center grid infrastructure and interconnection industry serves both new campus construction and upgrades to established sites.
Substations and switchyards accounted for 29.84% of the Europe data center grid infrastructure and interconnection market size in 2026. Every large grid connection requires a substation or comparable switching installation. This supports the component's role across greenfield and upgrade projects. Power transformers are also critical, but their availability can affect delivery schedules. The supplied research reported a 30% supply deficit for large power transformers through 2027. Early procurement is therefore important for projects seeking firm energization dates.
Transmission lines and cables are gaining relevance as development extends beyond dense, established hubs. Nexans reported major data center cable contracts in Europe and the United States during 2026. Grid connection, control, and monitoring systems are projected to expand at a 14.29% CAGR through 2032. ENTSO-E has highlighted the need for detailed measurement of changing data center loads. Advanced metering and automated response systems support coordination between operators and transmission system operators. The Europe data center grid infrastructure industry can benefit from this activity even when physical construction slows.