WHAT THIS FILE IS
The register behind the Sherpa Directory "Data Centre Power Deals", as data you can filter, join and load into your own models. One row for every power agreement for a data centre first announced between 1 January 2024 and 30 September 2026, worldwide: the data-centre party and its group, the power seller, the type of agreement, technology, campus, country, capacity, term and value where announced, and the sources.
Alongside it: every financing and ownership deal for data centres and their platforms, with the lenders, investors and advisers named; announced campuses with named parties; and summary tables of data-centre groups and power sellers with live counts.
Every value is as announced. A blank means it was not announced, and nothing is estimated. Deal numbers match the directory and stay the same in every update.
WHAT YOU RECEIVE
An Excel workbook with a Read me sheet that explains every column, plus the same tables as CSV files that load without cleaning. Deal numbers match the Data Centre Power Deals directory and stay the same in every update.
- Sherpa Data … 2024-2026.xlsx
- The workbook: Read me, Power deals, Financing deals, Campus announcements, Data-centre groups, Power sellers, Lenders, investors, advisers
- power_deals.csv / 768 rows
- One row per power agreement: data-centre party, seller, type, technology, campus, country, capacity, term, value, sources
- financing_deals.csv / 1,016 rows
- One row per financing or ownership deal: borrower or acquirer, counterparty, lenders, investors, advisers, amount, sources
- campus_announcements.csv / 148 rows
- One row per announced campus with named parties
- data_centre_groups.csv / 894 rows
- One row per data-centre group, with deal counts
- power_sellers.csv / 492 rows
- One row per power seller group, with deal counts
- lenders_investors_advisers.csv
- One row per firm named on a deal, with role and deal
- README.txt
- What is included, joins and how to read the figures
PREVIEW
The first rows of each table, exactly as they appear in the file. The rest is in the download.
HOW COMPLETE EACH FIELD IS
Shown before you buy, so you know exactly what you are paying for. Nothing is estimated to fill a gap.
FIELD GUIDE
- Deal
- Permanent record number (DCP- power, DCF- financing, DCC- campus). Unchanged in every update.
- Data-centre party / Data-centre group
- The operator, hyperscaler or developer as named, and the brand it belongs to.
- Agreement type
- PPA, nuclear, on-site generation, utility supply, grid connection, battery or backup power.
- Power seller / Seller group
- The generator, utility or supplier on the other side.
- Technology
- Solar, wind, nuclear, gas, fuel cells, storage and so on, as announced.
- Campus / site, Country, State / region
- Where the data centre is, as named.
- Capacity, Term, Value
- As announced. Never converted or estimated.
- Lenders, Investors, Advisers
- Firms named on financing deals, in the role reported.
- Source 1, Source 2, Other sources
- Links to the announcements each record rests on.