PUBLISHER: Mordor Intelligence | PRODUCT CODE: 2187412
PUBLISHER: Mordor Intelligence | PRODUCT CODE: 2187412
According to Mordor Intelligence, the Indonesia coal market size is expected to increase from 0.95 billion tons in 2026 to 1.01 billion tons in 2027 and reach 1.33 billion tons by 2032, growing at a CAGR of 5.62% over 2027-2032.

This report is segmented by Coal Grade (Sub-bituminous, Bituminous and Coking, and Lignite/Low-Rank) and Application (Power Generation, Iron, Steel, and Metallurgy, and Cement and Other Applications). The market forecasts are provided in terms of volume (tons), based on availability.
PT PLN (Persero), Indonesia's state electricity utility known as PLN, can create additional outlets for low-calorific-value coal through changes in its fleet's fuel capability. In July 2026, PLN said a successful retrofit of Suralaya units 6 and 7 allowed the plants to use low-rank coal at about 4,100-4,300 kcal/kg. The modification widens the usable fuel range at those units, giving lower-calorific coal a route into existing generating equipment. Broader coal deliveries to Indonesian power plants rose from 133.5 million metric tons in 2024 to 141.4 million metric tons in 2025. A joint operation of PT Arutmin Indonesia and PT Darma Henwa Tbk has contracted to supply PLN's Suralaya plants with 1.305 million metric tons of low-rank coal annually from 2009 through 2028.
Nickel processing connects coal demand to industrial power requirements alongside the utility system. In 2025, Indonesian nickel processing used more than 81 TWh of captive power, with over 94% generated from coal, according to Ember's estimate. Operational captive coal capacity linked to the nickel industry rose from 7.16 GW in 2023 to 15.4 GW in 2025. This larger operating base gives coal suppliers an industrial outlet whose fuel requirements depend on smelter operations, extending demand beyond PLN's purchasing needs. Suppliers can size contracts around operating smelters' fuel needs, with lower utilization reducing offtake even if no generating units close.
The DMO price cap constrains the economics of supplying PLN when mining costs rise. In June 2026, Indonesia's USD 70-per-metric-ton cap on DMO coal supplied to PLN reduced producers' economic incentive to allocate coal domestically as production costs rose. Stripping ratios at some mines rose to between 10 and 12, raising production costs while the price PLN pays stayed capped. The constraint is most acute for the mines with the higher stripping burden. Higher utility fuel needs cannot restore miners' cost recovery when additional regulated deliveries retain the same price ceiling.
Other drivers and restraints analyzed in the detailed report include:
For complete list of drivers and restraints, kindly check the Table Of Contents.
Sub-bituminous coal accounted for a 47.15% share of the Indonesia coal market size in 2026, making it the largest segment. PT Arutmin Indonesia, a PT Bumi Resources Tbk subsidiary, produced 8.2 million metric tons of sub-bituminous eco-coal at its Kintap mine in 2025. Arutmin's sub-bituminous eco-coal has very low sulfur and ash content and is used in domestic and overseas steam power plants. Arutmin's Asamasam site in South Kalimantan has capacity of up to 8 million metric tons of sub-bituminous coal annually, giving the operator another substantial site in this grade.
Bituminous and coking coal is forecast to be the fastest-growing segment, with a CAGR of 7.3% over 2027-2032. PT Alamtri Minerals Indonesia Tbk, an Alamtri Resources subsidiary, reported FY2025 total coal output of 7.41 million metric tons, up 12% from FY2024, mostly metallurgical with the remainder low-calorific coal. In 4Q2025, it completed the first 39-kilometer phase of a chip-seal hauling-road upgrade linked to its subsidiary PT Maruwai Coal's hard-coking-coal operations. Designed to support safe all-weather navigation, the upgrade addresses the link between mine output and dependable haulage. Because the upgrade is targeted to cover the entire hauling road surface, the 39-kilometer first phase leaves further work on Maruwai's haul route.